Biennial (har 2 saal) electrical safety audit licensed electrical contractor se karao: load distribution, earthing, RCCBs, panel temperature thermal imaging se (loose connections pakadne ke liye), exposed wiring check. Reference standard: National Electrical Code 2011. Findings + CAPA ORALZY → Maintenance → Electrical Audit Report me store karo. Assessor report ki DATE dekhta hai — 2 saal se purani = NC — aur CAPA closure bhi. Iska maksad short-circuit se fire rokna hai, isliye fire-safety questions ke saath link hoke aa sakta hai. Audit vendor ka licence copy bhi file me rakho.
Electrical safety audit kitni baar aur kisse karana hai?
FMS.3.b: licensed electrical contractor se har 2 saal me ek baar — earthing, RCCB, thermal imaging; report + CAPA file me rakho.
Where in ORALZY: ORALZY → Maintenance → Electrical Audit Report; SOP: Setup → NABH Hub → SOP Library → FMS-3